Skip to main content
Collections Menu
Cartoon - Sidewalk snow removal in Montreal… | McCord Museum
Le déneigement des trottoirs à Montréal…
View PDF
Le déneigement des trottoirs à Montréal…
Le déneigement des trottoirs à Montréal…

Cartoon

Sidewalk snow removal in Montreal…
Artist (Né / Born 1951)
SignatureL.r., GARNOTTE 2008-12-18
Date 2008
Medium / Technique Ink on card
Dimensions22.8 × 30.5 cm
Origin Montreal, Quebec, Canada
Object NumberM2011.90.505
CreditGift of Michel Garneau (Garnotte)
NotesThe second image presents the caricature as it was published in Le Devoir, after being finalized using drawing software.
Status
Not on view

Information about the objects in our collection is updated to reflect new research findings. If you have any information to share regarding this object, please email reference.mccord@mccord-stewart.ca.

Information about rights and reproductions is available here.

Online Collections | McCord Museum - Montreal Social History Museum
After the Ice Storm, electrical outages, storms and snow removal headaches ... the Fête des Neiges is finally here
After the Ice Storm, electrical outages, storms and snow removal headaches ... the Fête des Neiges is finally here
Serge Chapleau
1998
M999.81.31.1-2
Global Warming to Result in Massive Problems: -But big savings in snow removal!
Global Warming to Result in Massive Problems: -But big savings in snow removal!
Serge Chapleau
1997
M999.81.102
The Charter of Values. The consultation recommends removal of the crucifix…
The Charter of Values. The consultation recommends removal of the crucifix…
Garnotte
2013
M2020.92.201
Heated sidewalks in the Quartier des spectacles?...
Heated sidewalks in the Quartier des spectacles?...
Garnotte
2008
M2011.90.362
Removal of Christmas Lights
Removal of Christmas Lights
Aislin
2000
M2005.143.41
Snow-covered sidewalk and tall snowbanks, QC, ca. 1930
Snow-covered sidewalk and tall snowbanks, QC, ca. 1930
Harry Sutcliffe
About 1930
M2011.64.2.2.60
The Removal of a Dam Used for the Construction of Victoria Bridge
The Removal of a Dam Used for the Construction of Victoria Bridge
Inconnu / Unknown
1860
M15934.39
The Removal of a Large Boulder during the Construction of the Victoria Bridge
The Removal of a Large Boulder during the Construction of the Victoria Bridge
William Notman
1860
M15934.21
What could be worse at the Winter Olympics than a lack of snow?
What could be worse at the Winter Olympics than a lack of snow?
Garnotte
2010
M2012.51.263
Shovelling snow
Shovelling snow
Garnotte
1997
M2007.69.144
2013 budget. Flaherty is dumping his snow in the provinces’ yard…
2013 budget. Flaherty is dumping his snow in the provinces’ yard…
Garnotte
2013
M2020.92.55
A new Olympic discipline: transporting snow by truck
A new Olympic discipline: transporting snow by truck
Garnotte
2010
M2012.51.267

This project is made possible thanks to the generous support of the Azrieli Foundation and Canadian Heritage.