Skip to main content
Collections Menu
Lithograph - Statement Showing Cambres to which Tubes Were Laid, Subsidence during Construction, Deflection of Tubes, &c. | McCord Museum
Rapport indiquant les chambres où les tubes ont été posés, l'affaissement durant la construction, le fléchissement des tubes, etc.
View PDF
Rapport indiquant les chambres où les tubes ont été posés, l'affaissement durant la construction, le fléchissement des tubes, etc.

Lithograph

Statement Showing Cambres to which Tubes Were Laid, Subsidence during Construction, Deflection of Tubes, &c.
Lithographer
Publisher (1791-1862)
Date 1860
Medium / Technique Ink on paper
Lithography
Dimensions14.4 x 26.4 cm
Origin London, England
Object NumberM15934.51
CollectionMcCord
CreditGift of David Ross McCord
Status
Not on view

Information about the objects in our collection is updated to reflect new research findings. If you have any information to share regarding this object, please email reference.mccord@mccord-stewart.ca.

Information about rights and reproductions is available here.

Online Collections | McCord Museum - Montreal Social History Museum
Statement Showing Lengths of Tubes, their Weigths, and the Number of Days Occupied in Erection
Statement Showing Lengths of Tubes, their Weigths, and the Number of Days Occupied in Erection
Inconnu / Unknown
1860
M15934.50
Victoria Bridge, Diagrams Shewing the Deflections of the Tubes when Tested. January 5th, 1860
Victoria Bridge, Diagrams Shewing the Deflections of the Tubes when Tested. January 5th, 1860
William Oliver Gooding
1860
M15934.91
Britannia Bridge: platform and construction of tubes, September 1848
Britannia Bridge: platform and construction of tubes, September 1848
George Hawkins II
1849/08/01
M6924.4
Victoria Bridge Diagram Shewing Result of Testing Nos. 1 and 2 Tubes on the 29th April 1859
Victoria Bridge Diagram Shewing Result of Testing Nos. 1 and 2 Tubes on the 29th April 1859
Inconnu / Unknown
1860
M15934.48
Victoria Bridge, Traveller for the Inspection and Painting of Tubes, 1859
Victoria Bridge, Traveller for the Inspection and Painting of Tubes, 1859
J. Dunbar
1860
M15934.81
Victoria Bridge, Machine Used for Boring Side Lights in Tubes, 1859
Victoria Bridge, Machine Used for Boring Side Lights in Tubes, 1859
J. Dunbar
1860
M15934.83
Victoria Bridge, Details of Tubes Nos. 1. 2. 24 & 25
Victoria Bridge, Details of Tubes Nos. 1. 2. 24 & 25
J. Dunbar
1860
M15934.88
Isometrical projection of a portion of one of the tubes of the Britannia Bridge
Isometrical projection of a portion of one of the tubes of the Britannia Bridge
Matthew Forster
1849-1850
M6924.15
From no. 11 dam, showing no. 10 pier and staging for tubes, Victoria Bridge, Montreal, QC, 1859
William Notman
1859
N-0000.193.140.1
Conducting tubes (Apparatus for studying pockets of air in water channels)
1770-1800
1983.26.12
Conway Bridge, construction of second tube, September 1848
Conway Bridge, construction of second tube, September 1848
George Hawkins II
About 1848
M6924.38
Victoria Bridge, Details of Tube
Victoria Bridge, Details of Tube
J. Dunbar
1860
M15934.90

This project is made possible thanks to the generous support of the Azrieli Foundation and Canadian Heritage.