Skip to main content
Collections Menu
Wood engraving - The Removal of a Large Boulder during the Construction of the Victoria Bridge | McCord Museum
Enlèvement d'un gros bloc durant la construction du pont Victoria
Enlèvement d'un gros bloc durant la construction du pont Victoria

Wood engraving

The Removal of a Large Boulder during the Construction of the Victoria Bridge
Photographer (1826-1891)
Lithographer
Publisher (1791-1862)
Wood engraver (active 1856-1883)
SignatureL. c. printed within the image, Butterworth & Heath
Date 1860
Medium / Technique Ink on paper
Relief printing
Dimensions7.9 x 6.7 cm
Origin London, England
Object NumberM15934.21
CollectionMcCord
CreditGift of David Ross McCord
Status
Not on view

Information about the objects in our collection is updated to reflect new research findings. If you have any information to share regarding this object, please email reference.mccord@mccord-stewart.ca.

Information about rights and reproductions is available here.

Online Collections | McCord Museum - Montreal Social History Museum
The Removal of a Dam Used for the Construction of Victoria Bridge
The Removal of a Dam Used for the Construction of Victoria Bridge
Inconnu / Unknown
1860
M15934.39
Large boulder raised from coffer dam, Victoria Bridge, Montreal, QC, 1858
Large boulder raised from coffer dam, Victoria Bridge, Montreal, QC, 1858
William Notman
1880-1890
VIEW-7570.0
Raising large boulder, Victoria Bridge, Montreal, QC, 1859
Raising large boulder, Victoria Bridge, Montreal, QC, 1859
William Notman
1880-1890
VIEW-7575.0
Steam Crane Used for the Construction of Victoria Bridge
Steam Crane Used for the Construction of Victoria Bridge
Inconnu / Unknown
1860
M15934.36
Steam Floating Derrick Used for the Construction of Victoria Bridge
Steam Floating Derrick Used for the Construction of Victoria Bridge
Inconnu / Unknown
1860
M15934.35
Victoria Bridge under Construction
Victoria Bridge under Construction
Inconnu / Unknown
1860
M15934.32
Construction of the Deck Top Lining of Victoria Bridge
Construction of the Deck Top Lining of Victoria Bridge
Inconnu / Unknown
1860
M15934.33
Steam Derrick Used for the Construction of the Victoria Bridge
Steam Derrick Used for the Construction of the Victoria Bridge
Inconnu / Unknown
1860
M15934.17
The Construction of the Pier No. 16 of the Victoria Bridge
The Construction of the Pier No. 16 of the Victoria Bridge
Inconnu / Unknown
1860
M15934.23
Footway Used for the Construction of Victoria Bridge Roofing
Footway Used for the Construction of Victoria Bridge Roofing
Inconnu / Unknown
1860
M15934.42
Quebec Bridge during construction, Quebec City, QC, 1916
Quebec Bridge during construction, Quebec City, QC, 1916
Wm. Notman & Son
1916/09
VIEW-5675.1
Centre span during construction of Quebec Bridge, Quebec City, QC, 1917
Centre span during construction of Quebec Bridge, Quebec City, QC, 1917
Wm. Notman & Son
1917
VIEW-6091

This project is made possible thanks to the generous support of the Azrieli Foundation and Canadian Heritage.