Skip to main content
Collections Menu
Lithograph - Britannia Bridge: platform and construction of tubes, September 1848 | McCord Museum
Pont Britannia : plateforme et construction des tubes, septembre 1848
View PDF
Pont Britannia : plateforme et construction des tubes, septembre 1848

Lithograph

Britannia Bridge: platform and construction of tubes, September 1848
Draughtsman (1809-1852)
Lithographer (1809-1852)
Publisher (1791-1862)
Printer (1831-1867)
SignatureL. l. below image, G. Hawkins, del. et lith.; l. r. below image, Day & Son, lith.rs to the Queen; b. c. of sheet, London, Published for the Author, 1st Aug.t 1849; l. c. below image, ROBERT STEPHENSON, ESQ. M.P. ENGINEER
Date 1849/08/01
Medium / Technique Coloured ink on Cardboard
Lithography
Dimensions37.2 x 54.8 cm
Origin England
Object NumberM6924.4
CollectionMcCord
CreditGift of Mrs. Phillip Mackenzie
Status
Not on view

Information about the objects in our collection is updated to reflect new research findings. If you have any information to share regarding this object, please email reference.mccord@mccord-stewart.ca.

Information about rights and reproductions is available here.

Online Collections | McCord Museum - Montreal Social History Museum
Conway Bridge, construction of second tube, September 1848
Conway Bridge, construction of second tube, September 1848
George Hawkins II
About 1848
M6924.38
Conway Bridge. Floating of Second Tube, September, 1848
Conway Bridge. Floating of Second Tube, September, 1848
George Hawkins II
About 1848
M6924.40
Britannia Bridge, Carnarvon Tower
Britannia Bridge, Carnarvon Tower
George Hawkins II
1849
M6924.5
Conway Tubular Bridge, with preparations for raising of second tube
Conway Tubular Bridge, with preparations for raising of second tube
George Hawkins II
1848-1849
M6924.39
Isometrical projection of a portion of one of the tubes of the Britannia Bridge
Isometrical projection of a portion of one of the tubes of the Britannia Bridge
Matthew Forster
1849-1850
M6924.15
Plan of the Military & Naval operations under the command of the immortal Wolfe & Vice Admiral Saunders before Quebec
Plan of the Military & Naval operations under the command of the immortal Wolfe & Vice Admiral Saunders before Quebec
Alfred Hawkins
1841
1979.297
Statement Showing Cambres to which Tubes Were Laid, Subsidence during Construction, Deflection of Tubes, &c.
Statement Showing Cambres to which Tubes Were Laid, Subsidence during Construction, Deflection of Tubes, &c.
Inconnu / Unknown
1860
M15934.51
Victoria Bridge, Diagrams Shewing the Deflections of the Tubes when Tested. January 5th, 1860
Victoria Bridge, Diagrams Shewing the Deflections of the Tubes when Tested. January 5th, 1860
William Oliver Gooding
1860
M15934.91
Victoria Bridge Diagram Shewing Result of Testing Nos. 1 and 2 Tubes on the 29th April 1859
Victoria Bridge Diagram Shewing Result of Testing Nos. 1 and 2 Tubes on the 29th April 1859
Inconnu / Unknown
1860
M15934.48
Victoria Bridge, Traveller for the Inspection and Painting of Tubes, 1859
Victoria Bridge, Traveller for the Inspection and Painting of Tubes, 1859
J. Dunbar
1860
M15934.81
Victoria Bridge, Machine Used for Boring Side Lights in Tubes, 1859
Victoria Bridge, Machine Used for Boring Side Lights in Tubes, 1859
J. Dunbar
1860
M15934.83
Victoria Bridge, Details of Tubes Nos. 1. 2. 24 & 25
Victoria Bridge, Details of Tubes Nos. 1. 2. 24 & 25
J. Dunbar
1860
M15934.88

This project is made possible thanks to the generous support of the Azrieli Foundation and Canadian Heritage.